Land Rover Defender: Battery and Charging System
READ NEXT:
SPECIFICATIONS
Startup battery
Startup battery disconnect/connect
CAUTIONS:
The vehicle status and start up battery condition must be established
before attempting battery disconnect
/connect. R
DESCRIPTION AND OPERATION
1. INTRODUCTION
This document defines the requirements for care and maintenance of lead acid
startup and auxiliary batteries, and the
standard of battery care at retailers f
DESCRIPTION AND OPERATION
BATTERY CARE SHEET
Replacement startup and auxiliary batteries for service.
NOTE:
Fields marked with * are mandatory and must be completed.
Do the battery care requirements
SEE MORE:
REMOVAL AND INSTALLATION
GENERAL EQUIPMENT
REMOVAL
CAUTION:
Before disconnecting any components, make sure the area is clean and free from
foreign material. When
disconnected all openings must be sealed.
NOTE:
This procedure contains some variation in the illustrations depending
on the vehicle
DESCRIPTION AND OPERATION
1. INTRODUCTION
This document defines the requirements for care and maintenance of lead acid
startup and auxiliary batteries, and the
standard of battery care at retailers for new vehicles.
This procedure applies to all types of 12V lead acid startup and auxiliary
batter
© 2010-2026 Copyright www.lrdefender.org
